LED screens for the Premios Lorca gala
UMA
·
Granada
·
November 2025
A 6 × 3 m central screen at 2 mm pitch, two vertical LED banners flanking the stage and Novastar servers and scalers driving all of it.
The video installation for the Premios Lorca gala at Mae West: a central screen, two vertical banners and monitors around the room, all synchronised from one position.
6×3 m
central screen
2
vertical banners of 3.5 × 2 m
2 mm
pixel pitch
The screens
- Central LED screen of 6 × 3 m at 2 mm pitch — a gala is watched from the first row as well as the last, and 2 mm is what holds up close to the stage
- Two vertical LED banners of 3.5 × 2 m, rigged either side of the stage
- Professional monitors distributed through the room, synchronised with the main feed
Central control
Novastar servers and scalers handle processing and signal distribution: content managed live, every screen in step, and the whole system driven from the technical booth with system monitoring throughout the gala.
Rigging was done with certified structures and professional-grade cabling. The screens hang over people for the whole evening, which settles how that part gets done.